1. How high is the garden light?
The height of the garden light is generally between 2.5 meters and 5 meters. Modern garden lights are mostly customized garden lights, so the height can be customized according to customer requirements. Generally, 3 meters to 4 meters are used in the community, and the garden lights are on the sidewalks on both sides of urban roads or on both sides of pedestrian roads in parks. Generally, it is between 4 meters and 5 meters; secondly, there are garden lights produced by some molds (such as the height of garden lights of die-casting aluminum), which are generally fixed at about 2.8 meters to 3.5 meters.
Second, the basic size of garden lights
1. Height of garden lights
Generally, the height of garden lights is between 2.5 meters and 5 meters.
2. Dimensions of garden light flanges
The size of garden light flanges is generally 280×280, in centimeters.
3. The size of the embedded part of the garden light
The size of the embedded part of the garden light is 500cm.
4. Size of garden light base
The suitable base size of garden light base is 400cm square.
5. Specifications and dimensions of garden light poles
The specifications of garden light poles are 115mm equal diameter, 219mm equal diameter, etc.
6. Cone rod taper ratio of garden light
The taper ratio of garden light cone rod is generally 11‰.
Three, the practice of garden lights
1. Measurement and lofting
Strictly according to the construction drawings According to the datum point and reference elevation delivered by the resident supervision engineer, use the level to set out, and submit it to the resident supervision engineer for inspection.
2. Excavation of foundation pits
The foundation pits shall be excavated in strict accordance with the elevation and geometric dimensions required by the design, and the foundation shall be cleaned after excavation. and solidify the base.
3. Foundation pouring
(1) Strictly follow the material specifications specified in the design drawings and the binding method specified in the technical specifications, and tie the foundation steel bars. Manufacturing and installation, and verified by the resident supervision engineer.
(2) The foundation embedded parts should be hot-dip galvanized.
(3) Concrete pouring must be fully stirred in strict accordance with the material ratio, poured in horizontal layers, and the thickness of vibration and tamping should not exceed 45cm to prevent the two layers from being separated.
(4) Concrete is poured in two steps. The first time is poured to about 20cm above the anchor plate. After the concrete is initially solidified, the scum is removed. After the pre-embedded bolts are accurately corrected, pour the remaining parts. Part of the concrete, and ensure that the installation level error of the foundation flange is not more than 1%.
Declare: The above methods are derived from the program system index or shared by netizens. They are for your reference only and do not represent the research views of this website. sex and authority.