How to apply for the installation of new energy vehicle charging pilesWhat materials are required for the installation application of new energy vehicle charging piles

How to apply for installation of new energy vehicle charging piles

1. Apply to the property for confirmation

Understand the charging pile installation policy in the community and check the installation of charging piles in the community If you need additional technical equipment, please apply to the community in advance. At present, for the installation of charging piles, the general rule is to require parking spaces with own property rights. Some properties are not suitable for installing charging piles due to their early construction. If the installation of charging piles requires additional investment in technical equipment, you must communicate with the property in advance.

2. Look at the location of your parking space

Generally, there are power distribution rooms in residential areas. The distance between the parking space and the power distribution room will become a decisive factor in cost control. The power distribution room close to the parking space can save a lot of costs during installation.

3. Submit application and review materials

The applicant shall submit the registration form, identity certificate (ID card or organization code certificate), photos of the parking space on-site environment, and parking space certification materials to the The regional power supply department submits an application for installation of telegrams.

The power supply department, together with the applicant and the construction entity, will go to the site to conduct electricity consumption, construction feasibility investigation and determine the construction plan. The power supply department shall issue a reply to the electricity consumption plan within 7 working days and stamp it on the registration form.

4. Installation and construction

After the manufacturer has determined the construction plan, it is time for the installation and construction steps. It takes 2 hours to complete, and some may take a whole day to complete the construction.

Note: During the construction process, generally the first construction does not require the user to pay the construction fee, but if the construction is not completed within one day and needs to be postponed to the next day, the construction personnel will charge a certain labor fee , this cost is usually calculated according to the labor force and working hours, which is roughly a few hundred yuan.

In addition, the charging cable is free within 30 meters, and users need to purchase the cable for more than 30 meters.

5. Construction and use

After the power supply department agrees to apply for installation, the main body of the construction should start installing charging piles for users within 7 working days.

After the construction is completed, the charging pile company will report to the power company for record, and the power company will go to the site for acceptance. If the acceptance is passed, the meter will be sealed. The company will transfer it to the owner, or the owner will go to the power supply bureau to collect it.

What materials are required for the installation of new energy vehicle charging piles

1. “Electricity Application Form”

2. My identity Original and photocopy of the certificate.

3. Proof of property rights for fixed parking spaces or licenses from property units.

4. The property department shall issue a written statement to allow construction.

5. Proof of electric vehicle purchase.

How much does it cost to install a charging pile by yourself

If the manufacturer does not have a home charging pile, you need to buy another charging pile. The general price of a home charging pile is 2000-5000 yuan/ The general price of DC fast charging piles is 15,000-20,000 yuan per unit, and the prices of different power and different models are high and low. In addition, the installation service fee and material cost are generally paid for by the owner. If the installation location has no other special circumstances, the installation service fee will generally not exceed 1,000 yuan.