Removal steps of integrated ceiling bathroom heater Replacement method of integrated ceiling bathroom heater

Removal steps of integrated ceiling bathroom heater

The disassembly method of integrated ceiling bathroom heater is very convenient, just three small steps: suction, pull, and disassembly. Usually, the manufacturer will provide a small tool. Just gently put it on the board, suck the air away, suck one of the corners tightly, and then pull it hard to pull out the four corners, and then the whole board can be disassembled.

Integrated ceiling bath heater installation steps

1. Install the corner lines

First, there is the installation of the receipt strip. To be flat and firm, first determine the height of the installation and draw a horizontal line. Then, when the tiles are installed and level, the matching corner lines of the integrated ceiling are tightly fixed on the tiles so that there is no obvious gap.

2. Install the keel

Next, make the distance between the boom and the keel the same as the panel size. Then, make an expansion eye on the top and fix all the booms. Note that the lower mouth of the boom and the hook must be connected well; then place the main keel frame in the middle of the hook and fix it, and adjust the height nut to make the bottom plane of the main keel away from the edge. The flat line on the strip can be fastened.

3. Install the gusset plate

Before installing, remember to wear gloves, not only to protect your hands, but also to ensure its beauty and cleanliness Spend. Then start the installation, fix the template, draw more than three times with a utility knife and a ruler, cut the folded edge into a 90-degree angle with scissors, and fold and press it 2-3 times by hand. Then, the corresponding surface of the cutout of the template is clamped into the keel, the cutting surface is placed on the edge strip, and the edge strip is pulled out to clamp the template, and the triangular hanger is clamped with steel pliers and the main keel to control the template. Keep the gap between the seams in a straight line.

4. Top wiring and buckle panel

Determine where lamps, electrical appliances, etc. need to be installed, and arrange the wiring in advance; the last is the buckle panel , it can be said that this link is directly related to the overall effect of the ceiling, both to achieve smooth and straight seam.

Integrated ceiling Yuba lamp replacement method

1. Use a knife to lift an integrated board down at the gap of the integrated board, and you can take an extra piece.

2. Put your left hand into the Yuba lamp hole to the side of the shell, and your right hand into the integrated top to find a part of the Yuba shell.

3. After the shell is taken off, you can directly take the middle light.

4. After processing, you can put the Yuba shell with the gaps integrated back, and then install the integrated board.