1. How to maintain the computerized embroidery machine
The maintenance of the embroidery machine should be carried out by the embroidery workers. The ordinary embroidery machine parts should be carefully checked for 5~10 minutes, and the embroidery machine should be carefully checked. Parts 10~15 minutes to check the equipment carefully. It is necessary to wipe all parts of the machine and add lubricating oil to keep the equipment neat, tidy, lubricated and safe, which is conducive to the smooth operation of the machine. At present, the maintenance parts of embroidery machines are mainly: spindle gearbox, thread trimming and hooking structure, thread adjusting structure, color changing structure, X-axis guide rail drive, Y-axis guide rail drive, thread clamping structure, and embroidery frame structure.
Second, computerized embroidery machine cleaning parts
Timely cleaning of dust and sundries on the embroidery machine is not only to ensure the beauty of the machine, but also to ensure The machine is in good working condition, so that the embroidery machine can achieve exquisite embroidery effect.
1. Use a brush to clean the hook, bobbin case and bobbin of the hook structure, and try not to use sharp tools to clean it.
2. Clean up the debris and thread ends from the thread rod, thread path and felt of the thread adjustment structure.
3. The thread clamping structure rotating wheel, thread adjustment, thread adjustment spring and thread adjustment channel should be cleaned frequently.
4. Scissors, tape measure, tape, embroidery needles, etc. are cleaned on the worktable and the surface of the embroidery frame.
5. Wipe the surface of the computer and the exhaust fan frequently, open the back cover, and clean the dust.
6. The power box and drive box also need to be wiped dust frequently to keep them clean.
Three.Computerized embroidery machineMaintenance parts and lubrication parts
1. Stepper motor Air filter for drive case. Clean up once a week with a brush.
2. The air filter of the power box. Clean up once a week with a brush.
3. The frame drives the guide rail. Clean up once a week (before oiling) with a brush.
4. Needle bar seat slide plate groove. Clean up 1 time before each oil, with a brush.
5. The thread take-up spring of the thread clamping seat. Clean up once a day with a brush.
6. Thread take-up lever gear. No. 2 white oil is required. Clean up once a week.
7. Large connecting rod and front and rear metal parts. No. 2 white oil is required. Clean up once a week.
8. The groove of the slide rail of the needle bar seat. Use butter. Clean up once a week, and need to remove the needle bar seat panel.
9. Needle bar sliding part. No. 2 white oil is required. Clean up once a week. Need to remove the needle bar seat panel.
10. Rotary shuttle. No. 2 white oil is required. 1-2 times a day. Clean with a brush before refueling.
11. Hook gear. Need to use butter, once a week, remove the needle plate.
12. Drive chain, refuel once in 2-3 months, use butter.
13. No. 2 white oil is required for the driving shaft driven by the needle bar. Clean up once a week. Need to remove the needle bar seat panel.