Introduction If the old house is to be renovated, we must first remove the ceiling and re-decorate it. After all, the effect of the ceiling decoration, which occupies one-third of the area, directly affects the style of the home. So how do you refurbish the ceiling? There are a lot of attention and precautions in the four technical tasks of ceiling renovation. Let’s take a look at the renovation knowledge of gypsum board ceiling, wood ceiling, integrated ceiling, kitchen and bathroom ceiling and keel ceiling. Gypsum board ceiling renovation
Removal
The overall removal does not retain the original ceiling decoration structure, which will affect the later installation.
Circuit safety disconnect power and remove circuit lines.
Protect other equipment Consider the safety of the equipment and facilities in the original ceiling to avoid damage to the ventilation ducts and flues.
Pay attention to safety wearing safety helmets and gloves, and the removed ceilings must be stacked to avoid dumping and hurting people.
Installation
Check that the equipment pops up the level line on the wall stud, and pops up the layout point control line of the suspender at the bottom of the floor.
The connecting structure of the connecting equipment hanger rod, the main keel is connected to the hanging bar, and the side keel, the secondary keel and the transverse support keel are installed and fixed.
Installation of gypsum board Select the gypsum board suitable for the use environment, and fix it on the secondary keel and the cross keel.
The board seam is filled with caulking putty, and the seam tape is pasted on the caulked seam with adhesive or white latex.
When scraping the putty in batches, pay attention to the connection and end of the putty, and sand it with sandpaper when it is dry.
Paint finishing should control the spray pressure, spray distance and sequence.
Renovation of wooden ceiling
The elastic line is vertically measured to the ceiling design elevation with a ruler, and the elastic line is placed on the keel position line on the ceiling.
Install the main keel boom according to the position of the main keel and the hanging spacing, and fix the boom without bolts under the floor.
Install the main keel, insert the hanging piece into the boom bolt, tighten the nut, connect the main keel, and install the connecting piece.
Install the secondary keel and hang the secondary keel on the main keel through the triangular pendant.
Install the aluminum edge strips Fix the edge aluminum strips with cement nails around the wall.
Install the aluminum gusset plate to fully clamp both sides of the square plate into the secondary keel, and straighten the edge aluminum strip to fix the edge aluminum plate.
Installing lamps and vents Make holes according to the size of the lamps and vents, and install the lamps and vents.
Integrated ceiling renovation
Removal
A small tool is used for suction, and it is collected on the board to suck the air away.
Tighten and suck one of the corners, then pull harder.
Pull out the four corners to remove the entire board.
Precautions Consider the safety of the equipment; the ceiling height should be moderate; the power supply should be cut off before dismantling; be careful not to damage the pipeline and equipment; try to dismantle it as cleanly as possible; avoid damaging the original structure.
Installation
Install six screws in the brick holes on the ceiling, screw them into the expansion pipe screws, and tap the connection between the expansion screws and the screws into the drilled holes.
Install the keel, clip the main keel on the hanger, put the triangle hanger into the triangle keel, and clamp the triangle hanger on the main keel.
Installing the gusset plate Insert the connector into the triangular keel, install the gusset plate, clamp the gusset plate in the triangle keel, and control the gap of the gusset plate.
Install the electrical appliance Put the box with the circlip on the keel, connect the junction box according to the wiring label, and check whether the gusset plate is flat.
Refurbishment of aluminum gusset ceiling
The corner line is installed, punched and nailed into the wooden wedge, cut both ends of the corner line into half of the corner, and fasten the corner line with screws.
Installation of the roof screw expansion sleeve, measure out the drilling installation point, insert the screw rod into the hole, tighten the nut, and fix the screw rod and the three-eighth keel firmly.
The keel installation is to fix the main keel on the screw rod at the lower end of the expansion sleeve, and connect the triangular keel to the three-eight keel.
When installing the range hood pipe and water heater pipe gusset plate, make holes according to the pipe on site.
Installation of aluminum gusset plate Clip the aluminum gusset plate on the triangular keel, and install it piece by piece, paying attention to keep the gap between the joints consistent.
Acceptance that the ceiling and the supporting electrical appliances are installed flat and consistent; the ceiling pattern is consistent; the supporting electrical appliances have been debugged and can be used normally.
PVC ceiling renovation
Removal
Cut off the power supply The circuit and pipeline inside the original ceiling should be removed, it is worthless.
AVOID DAMAGE TO OTHER EQUIPMENT Take the safety of equipment and facilities within the ceiling into consideration, such as heating pipes, ventilation ducts and flues.
Installation
Prepare materials Prepare materials, various jobs, ladders.
Punch the main keel on the hanger, put the triangle hanger into the triangle keel, and clamp the triangle hanger on the main keel.
The main keel is hung on the boom, and there are hooks under the boom to fix the main keel above.
Installing the gusset plate Just buckle the gusset plate on top in turn, leaving a position for installing the light.
Refurbishment of mineral wool board ceiling
Measure the control elevation of the ceiling, and the axis plane line is combined with the floor line and the wall cylinder.
The installation of the suspension rod is based on the ceiling design elevation, and the elastic line along the wall and cylinder surface is used as the standard line for ceiling installation.
When installing the base keel, the base keel should be connected to the hanger with a hanging piece, and the screws should be tightened firmly.
Installation of mineral wool board After the keels are installed and passed the inspection, start to install the mineral wool board, wear gloves, and keep the mineral wool board clean.
Light steel keel renovation
Remove the self-tapping screws, remove the gypsum board, and take out the keels in sequence.
Installation
Bounce the level line Use a spirit level to copy out the level point, pop up the level line, pop up the position of the main keel, and mark the fixed point of the boom.
Fix holes on the top plate for fixing the hanging rod, install the expansion bolts, and carry out anti-rust treatment.
Install the side joists with self-tapping screws to fix the L-shaped galvanized light steel bars on the pre-buried wooden bricks.
Install the main keel parallel to the long direction of the space, pay attention to the arching during installation.
Install the secondary keel close to the main keel, fix the secondary keel on the main keel, and place both ends on the horizontal flange of the side keel.
Completely correct the keel frame to ensure that the structural position and levelness of the primary and secondary keels are qualified and correct, and then tighten the hanging pieces and connecting pieces.